Skip to content
English - United States
  • There are no suggestions because the search field is empty.

How deep should PE pipes be laid?

25–30 cm – about one spade deep.

For PE pipes, a depth of approx. 25–30 cm is usually sufficient - this corresponds to about one spade deep. This protects the pipes while still allowing access to them. It is important to lay pipes at a uniform depth so that everything is neat and tidy later on.

In short: Lay PE pipes one spade deep.